Homes by Hammer Hero: Custom Home Builder in Cherry Hills Village

Last updated: November 28, 2026

Homes by Hammer Hero is Hammer Hero LLC’s custom home program, and we work as a custom home builder in Cherry Hills Village on custom homes, ADUs, and high-end remodels. Cherry Hills Village is its own city in Arapahoe County, not part of Denver. Permits, codes, and zoning all follow Cherry Hills Village’s rules, and many residential lots are measured in acres, not square feet. High-end custom homes typically run about $300 to $600 per square foot. Call (720) 327-5898, Monday through Friday, 8:00 AM to 4:00 PM.

Who issues building permits in Cherry Hills Village?

The City of Cherry Hills Village Community Development department issues building permits and inspections through its online portal.¹ Denver’s permit office has no role. Planning and Zoning reviews the application first for zoning compliance; Building and Engineering, or Civil, review come after that.² ³ According to the city:¹ ⁴

  • Everything runs through the portal: the application, revisions, fees, review comments, and inspection requests. First-time portal users must register; the city says approval can take up to one business day.
  • A new-home submittal needs a complete digital plan set: stamped construction and structural plans, a survey-based site plan, height and bulk-plane elevations, a floor-area-ratio worksheet, an exterior lighting plan, energy calculations and a Manual J, a construction staging plan, and civil plans. A soils report is required if the structural plans reference one.
  • Proof of outside-agency work is required as applicable: a sewer permit or release, South Metro Fire Rescue plan submittal, a South Metro Fire Rescue fire-sprinkler permit before the city issues the building permit on a new home, CDPHE approval when a demolition triggers state asbestos rules, and a City Public Works right-of-way permit.
  • Adding more than 2,500 square feet of impervious surface (house, driveway, or patio, counted cumulatively with earlier work) requires a Phase III Drainage Plan.
  • The city’s published review estimate for a new home or major addition is 10 business days per review cycle. That is a city estimate, not a guarantee.³ ⁴
  • A Certificate of Occupancy is required before anyone occupies a new single-family dwelling or a major addition.

Does Cherry Hills Village require design review?

Cherry Hills Village does not run a separate architectural design-review board that approves style, colors, or materials. What it does require, before you can apply for a permit on a new single-family home, is a preapplication neighborhood input meeting. The same meeting is required for an addition that increases square footage by 50 percent or more, and for a second story added to a one-story house.⁵

According to the city’s meeting application and municipal code:⁵

  • The city sets the meeting date and gives you the mailing list.
  • Notice goes to affected property owners (contiguous lots and lots across the street) and any registered homeowners association by certified mail at least 15 days before the meeting.
  • At least seven days before the meeting, you send the city a construction schedule, a preliminary staging plan, a survey-based site plan, height and bulk-plane drawings, and the mailing receipts. Architectural style, colors, and materials are not required for those drawings.
  • After the meeting, you have 180 days to apply for the building permit, or the meeting process starts over.

Planning and Zoning then reviews the permit plans against the Zoning Ordinance, including setbacks, height, bulk plane, and floor area.² HOA or architectural-control covenants, if your lot has them, are a separate private review; we confirm those before design.

Which building codes apply in Cherry Hills Village?

Cherry Hills Village builds to the 2024 International Residential Code, 2024 International Energy Conservation Code, 2024 International Fire Code, and the related 2024 I-codes, plus the 2020 National Green Building Standards and the National Electrical Code edition approved by the State of Colorado.⁶ That code list is posted on the city’s Adopted Building Codes page and is newer than the 2021 editions still printed on some 2024 handouts. A design drawn for a Denver lot cannot be submitted unchanged.

How does Cherry Hills Village zoning affect a custom home?

Cherry Hills Village’s zoning code names its residential districts by minimum lot size, from R-1 (2½-acre residential) down to R-5 (16,000-square-foot residential), plus a variable-lot R-3A district.⁷ ⁴ All residential-zoned lots are zoned for single-family use.⁴ The city’s June 6, 2024 new-home handout, which summarizes Chapter 16, lists these principal-structure standards:⁴

  • R-1: minimum lot of 2½ acres; setbacks of 75 feet front, 50 feet rear, and 50 feet each side; maximum height of 35 feet; maximum floor area ratio of 23 percent.
  • R-2: minimum lot of 1¼ acres; setbacks of 75 feet front, 40 feet rear, and 40 feet each side; maximum height of 35 feet; maximum floor area ratio of 23 percent.
  • R-3: minimum lot of 1 acre; setbacks of 50 feet front, 25 feet rear, and 25 feet each side; maximum height of 35 feet; maximum floor area ratio of 25 percent.
  • R-4: minimum lot of ½ acre; setbacks of 25 feet front, 25 feet rear, and 30 feet total at the sides with at least 10 feet on either side; maximum height of 30 feet; maximum floor area ratio of 30 percent.
  • R-5: minimum lot of 16,000 square feet; setbacks of 25 feet front, 25 feet rear, and 7.5 feet each side; maximum height of 30 feet; maximum floor area ratio of 30 percent.

Setbacks are measured to any part of the structure, including eaves, overhangs, and cantilevers.⁴ Homes in R-1 through R-5 must also fit a bulk plane: the front starting height is 21 feet in R-1 through R-4 and 12 feet 6 inches in R-5, the rear starting height is 12 feet 6 inches, and the plane then slopes inward at 40 degrees.⁴ The R-3A district uses lot-size-based variations, so we confirm that district separately. Setbacks and floor-area caps like these shape the house as much as the budget does. A tall, compact Denver-style plan rarely fits the larger-lot districts; we confirm the lot’s district and any subdivision covenants before design. Check the current code, because districts and standards can be amended.

Can I build an ADU in Cherry Hills Village?

Colorado’s 2024 ADU law (HB24-1152) requires cities with 1,000 or more people inside a metropolitan planning organization, including Cherry Hills Village, to allow one ADU where single-unit detached homes are allowed, through an administrative review with no public hearing.⁸ The state says those rules apply even where HOA covenants would otherwise prevent ADUs.⁸ Cherry Hills Village also publishes guest-house standards, last revised June 6, 2024, that are more limited than the state law; we confirm the current ADU rules with Community Development for your lot rather than relying on that older handout alone.⁹ A Hammer Hero ADU typically runs about $150,000 to $300,000. See our ADU cost guide.

How does Front Range weather affect a Cherry Hills Village build?

Expansive soils are common along the Front Range (Colorado Geological Survey). Cherry Hills Village asks for a soils report when the structural plans reference one, and a drainage plan when the added impervious area is large enough.¹ ⁴ Hail is a documented regional risk (NWS Denver/Boulder). Large lots also mean long utility runs and driveway grading, which we price early.

What does a Cherry Hills Village project cost?

ProjectHammer Hero rangeNotes
Custom home (Homes by Hammer Hero)About $300–$600 per sq ftIncludes design coordination, permits, construction, and finishes. Excludes land, utility tap or hookup fees, and landscaping.
ADUAbout $150,000–$300,000Full build including permits and utility hookups; conversions sit at the low end.
Pop-top (second-story addition)About $450–$650+ per sq ftStructure, roof, and stair work drive the range.
Kitchen remodelAbout $350–$650 per sq ft
Bathroom remodelAbout $450–$750 per sq ft
Basement remodelAbout $85–$200 per sq ft

These are Hammer Hero’s customer ranges, not citywide averages and not bids. We put your scope and price in writing before work starts.

Example (arithmetic, not a bid): a 6,000-sq-ft custom home at $300 to $600 per sq ft is about $1.8 million to $3.6 million for the construction scope. Land, tap fees, and landscaping are separate. A South Metro Fire Rescue fire-sprinkler permit is part of a new-home submittal, and we include that work in early design and pricing.

How long does it take?

ProjectTypical construction time
Custom homeAbout 10–14 months after permits are issued
ADUAbout 6–9 months after permits are issued
Kitchen remodelAbout 1–3 months
Bathroom remodelAbout 3–6 weeks
Basement remodelAbout 2–4 months

Design and permitting come first, including the neighborhood input meeting on a new home. Permit review, finish selections, material lead times, and winter weather can add time. You get a written schedule before work starts.

Cherry Hills Village projects

Project gallery coming. Ask to see completed Hammer Hero work during your consultation.

Who builds custom homes in Cherry Hills Village?

Hammer Hero LLC builds custom homes in Cherry Hills Village through Homes by Hammer Hero. We are a licensed general contractor founded in 2015. We confirm the lot’s zoning first, then design, permit with the City of Cherry Hills Village, and build. Custom homes typically run about $300 to $600 per square foot.

Who issues building permits in Cherry Hills Village?

The City of Cherry Hills Village Community Development department issues building permits and inspections through its online portal. Denver does not. Planning and Zoning reviews first, then Building and Engineering. For a new home, a preapplication neighborhood input meeting is required before you apply for the permit.

Does Cherry Hills Village require design review for a new home?

The city does not run a separate architectural design-review board for style or materials. It does require a preapplication neighborhood input meeting before a new home, a major addition, or a second story on a one-story house. Planning and Zoning then reviews the plans for zoning compliance, including setbacks, height, bulk plane, and floor area.

Can I build an ADU in Cherry Hills Village?

Colorado’s 2024 ADU law requires Cherry Hills Village to allow one ADU where single-unit detached homes are allowed, through an administrative review with no public hearing. The city has also published guest-house standards. We confirm the current rules with Community Development for your lot. A Hammer Hero ADU typically runs about $150,000 to $300,000.

How much does a custom home cost in Cherry Hills Village?

Hammer Hero’s range for a high-end custom home is about $300 to $600 per square foot, including design coordination, permits, construction, and finishes. Land, utility tap fees, and landscaping are extra. A 6,000-square-foot home works out to about $1.8 million to $3.6 million. That is arithmetic, not a bid.

Related pages

Start a conversation about Cherry Hills Village

Planning a custom home, ADU, pop-top, or high-end remodel in Cherry Hills Village? Call Hammer Hero LLC at (720) 327-5898, Monday through Friday, 8:00 AM to 4:00 PM, or use our contact page. Hammer Hero LLC is a licensed general contractor founded in 2015 by Aaron Andricci. Office: 3230 W Mississippi Ave, Denver, CO 80219.

Call (720) 327-5898 Request a consultation

Sources

¹ City of Cherry Hills Village, Building Permits, read November 28, 2026.

² City of Cherry Hills Village, Planning & Zoning Division.

³ City of Cherry Hills Village, Planning and Zoning Division permit-review slides (2026), 10 business days per review cycle; Planning and Zoning first, then Building and Engineering/Civil.

⁴ City of Cherry Hills Village, New Single-Family Dwelling and Major Addition Requirements, revised June 6, 2024. Zoning figures summarize Chapter 16; confirm against the current municipal code. The handout’s code list is older than the city’s current Adopted Building Codes page.

⁵ City of Cherry Hills Village, Pre-application Neighborhood Input Meeting application, implementing Municipal Code Sec. 18-11-80, as amended by Ordinance No. 5, Series 2022.

⁶ City of Cherry Hills Village, Adopted Building Codes, read November 28, 2026.

⁷ Cherry Hills Village Municipal Code, Chapter 16, Article II, Sec. 16-2-10, Zoning Districts.

⁸ Colorado Division of Local Government, Accessory Dwelling Units (HB24-1152). Cherry Hills Village is listed as a subject jurisdiction.

⁹ City of Cherry Hills Village, Guest House Requirements, revised June 6, 2024. Treat as a starting point only; confirm current ADU standards with Community Development.