Homes by Hammer Hero: Custom Home Builder in Denver
From lot to move-in, built by Hammer Hero LLC
Last updated: November 18, 2026
Homes by Hammer Hero is the custom home program of Hammer Hero LLC, a licensed general contractor and custom home builder in Denver. Since 2015, Hammer Hero has guided custom builds from the first design conversation through permitting, construction, and the final walkthrough. Homes by Hammer Hero builds high-end houses designed around your lot, lifestyle, and budget, in Denver and the Front Range within about 50 miles. High-end custom homes typically run about $300 to $600 per square foot, including design coordination, permits, construction, and finishes. Call (720) 327-5898, Monday through Friday, 8:00 AM to 4:00 PM, to start a consultation.

Ready to talk about a custom home in Denver? Call Hammer Hero LLC at (720) 327-5898 or email hammerheropro@outlook.com. You can also use our contact page. Hours are Monday through Friday, 8:00 AM to 4:00 PM. Our office is at 3230 W Mississippi Ave, Denver, CO 80219.
What is Homes by Hammer Hero?
Homes by Hammer Hero is the custom home program of Hammer Hero LLC, a licensed general contractor in Denver founded in 2015 by Aaron Andricci. Homes by Hammer Hero covers high-end custom homes from the first lot conversation through design, permits, construction, and move-in. It is the same company, license, and team, under one name for our custom home work.
What that means for you:
- One accountable builder. Hammer Hero LLC holds the contract, pulls the permits, and manages the build. Homes by Hammer Hero is not a separate company or a franchise.
- A written number before you commit. Your scope, the $300 to $600 per-square-foot range applied to your house, and what is excluded (land, utility tap or hookup fees, landscaping) are in writing before work starts.
- A written schedule. About 10 to 14 months of construction after permits are issued, with design and permitting first.
- Lot help. Hammer Hero does not sell lots. If you still need land, we will point you to lots through a realtor partner, and we check zoning and soils before you buy.
How much does a custom home cost per square foot in Denver?
For a high-end custom home in Denver, Hammer Hero’s range is about $300 to $600 per square foot. That figure includes design coordination, permits, construction, and finishes. It does not include the land, utility tap or hookup fees, or landscaping. The final figure depends on size, finishes, site conditions, and design complexity. We will put your scope in writing before work starts.
That range is for high-end custom construction, not a production or tract house. Finish level, structural complexity, a basement, a steep or tight lot, and long material lead times all move the number. Using this range, a 2,500-square-foot high-end custom home would be about $750,000 to $1,500,000 for the construction scope assigned to the per-square-foot figure.
Before you compare builders on price alone, ask what is inside the number. Land, utility tap or hookup fees, and landscaping are billed separately from the $300 to $600 per-square-foot range. We will walk through those items with you and write them into the contract so there is no guessing later.
If you are also considering a backyard unit instead of a full custom house, see our ADU construction page. Accessory dwelling units are a different project type, with their own typical range of about $150,000 to $300,000.
How long does a custom home take to build in Denver?
A custom home in Denver is a multi-stage project: design, city permits, then construction through final inspections and a certificate of occupancy. Design and permitting happen before groundbreaking. After permits are issued, construction typically takes about 10 to 14 months. Winter weather, material lead times, or plan-review comments can affect the calendar. We will give you a written schedule for your home.
The city reviews drawings for zoning, building, drainage, structural, energy, and related rules before a construction permit is issued. Denver publishes average plan-review times on its Plan Review Dashboard, and those times can change. Winter weather on the Front Range can delay excavation, concrete, and exterior work. We will not start construction until the required permits are in hand, and we will update you as inspections and material deliveries land on the calendar.

What permits do I need to build a custom home in Denver?
In Denver, a new home typically needs zoning, building, and sewer use and drainage (SUDP) permits from Community Planning and Development, filed in e-permits. Trade permits for electrical, plumbing, and mechanical work are also required. A teardown needs a separate demolition permit, and a new official address should be requested before construction permits are logged in.
Denver’s official permitting checklist for new homes and additions also requires a survey and a geotechnical soils report for all new dwelling construction, plus architectural drawings, structural drawings and calculations, excavation documents where they apply, and energy documents. Energy compliance is under the 2025 Denver Energy Code, which is based on the 2021 International Energy Conservation Code (IECC) with Denver’s amendments. New heating and cooling equipment typically requires Manual J, S, and D reports along with the city’s residential energy checklist.
Design has to account for local conditions in the 2025 Denver Building and Fire Code (2nd Printing, November 2025), including the 2024 International Residential Code (IRC) as amended:
- Frost line depth is 36 inches below finished grade.
- Table R301.2 lists a 43 psf ground snow load, with location-specific values permitted through the ASCE 7 Hazard Tool, and wind design speeds of 115, 125, or 140 mph. Denver is a special wind region; exact speed depends on location (see also Table 1609.3, which varies by corridor, including Federal Boulevard, Sheridan Boulevard, and Kipling Street).
- Where expansive, compressible, shifting, or other questionable soils are likely, a soils test is required (Denver Residential Code Section R401.4). That is one reason every new dwelling needs a geotechnical report with the permit submittal.
- Damaging hail is a documented Front Range risk. The National Weather Service in Denver/Boulder has published event summaries for storms such as the May 30, 2024 Denver hailstorm and the May 8, 2017 storm it describes as the costliest hailstorm in Colorado history. Roof systems still have to meet the city’s adopted wind design. A specific hail-impact class is not listed as a mandate in Table R301.2; we specify roofing for this climate and for your contract, not as a generic promise.
Zoning rules (setbacks, height, bulk plane, and lot coverage) vary by zone district. We check the lot against the Denver Zoning Code rather than using one citywide size or height number.
If the lot is in Englewood, Greenwood Village, or elsewhere along the Front Range within about 50 miles of Denver, we still build there, but permitting follows that city’s rules, not Denver’s. See our Greenwood Village guide.
Official Denver sources
- New homes and additions permitting checklist
- Denver e-permits
- Building and fire codes (2025 Denver code, including the 2024 IRC and 2021 IECC as amended)
- Denver Residential Energy Code
- Denver Zoning Code
- Official address requests for a new single-family home (request before logging in for permits; $60 per address)
- Plan Review Dashboard (average review times): search “Denver Plan Review Dashboard” or start from the new-homes checklist’s helpful websites list.
What is the step-by-step process for building a custom home?
We start with a consultation on your lot, budget, and how you want to live. Next comes design, a survey, and a geotechnical soils report, then permit drawings. After Denver issues permits, we build from site work and foundation through framing, systems, and finishes, with inspections along the way, and we close with a walkthrough and certificate of occupancy.
Here is the process in more detail:
- Consultation. We meet to review your lot (or the house you may replace), your must-haves, and a realistic budget based on the $300 to $600 per square foot range for high-end custom homes.
- Design and site due diligence. Floor plans and specifications are developed around how you live and around the lot. A survey and geotechnical soils report are prepared for permit submittal. Structural and energy documentation is completed to the current Denver Residential Code and Denver Energy Code.
- Permitting. We coordinate zoning, building, and SUDP applications in Denver e-permits, along with required trade permits. If this is a teardown, demolition permitting and address assignment are handled in the right sequence, as described below.
- Site work and foundation. After permits are issued, we prepare the site and build the foundation to the soils report and to Denver’s 36-inch frost line, with excavation protections as required.
- Framing and building systems. Walls, roof structure, windows, and roofing go up, followed by electrical, plumbing, and HVAC rough-in, with city inspections at the required stages.
- Finishes. Insulation, drywall, exterior cladding, interior finishes, cabinets, flooring, and fixtures are completed to the approved specifications.
- Close-out. Final inspections, the certificate of occupancy, and a walkthrough to confirm the work against the contract. Punch-list items are completed before we close the job.
Do I need to own a lot first, and can you handle a teardown?
You can start with a vacant lot or a house you plan to replace. Hammer Hero does not find lots itself; if you still need land, we will point you to lots through a realtor partner. We build on lots in Denver and along the Front Range within about 50 miles. A Denver teardown requires a city demolition permit, state asbestos approval, utility cut-offs, and often Landmark Preservation review. The new house still has to meet zoning for that lot.
For a full demolition in Denver (complete removal of a structure, or removal of 40% or more of the total exterior wall area), the city requires a demolition permit. Before you can apply, the Colorado Department of Public Health and Environment (CDPHE) must approve a demolition notification for each structure, even if the asbestos inspection found no asbestos. Water, wastewater, gas, and electric services have to be cut off or controlled. Landmark Preservation reviews total demolition of non-landmark structures; if staff finds no landmark designation potential, the city says approval comes within 10 business days of a complete application. If staff finds potential, a longer public posting period applies. Denver’s demolition page lists about 50 to 60 days for the pre-permit approval steps on a total demolition; that is the city’s published timeframe, not a guaranteed calendar for every lot.
For permit applications submitted on or after September 1, 2026, qualifying new construction or demolition over 500 square feet must also follow Denver’s Universal Recycling and Composting Ordinance (URCO). That includes a waste diversion plan and a refundable performance security deposit before the related construction or demolition permit is issued.
A new official address for a single-family home should be requested through Denver DOTI Addressing before construction permits are logged in. The city’s current fee is $60 per address, and the submittal is a site or plot plan showing the structure, property lines, streets, a north arrow, and an X at the front door.
Teardown and lot sources
- Denver demolition permits
- Landmark review for non-landmark demolition
- CDPHE asbestos / demolition notification
- URCO construction and demolition recycling
- Official address request (new single-family or duplex)
- NWS Denver/Boulder event summaries (hail and severe weather)
How should I choose a custom home builder in Denver?
Choose a builder who is licensed and insured, will work to Denver’s current codes, and will put price, scope, and schedule in writing. Hammer Hero LLC is a licensed general contractor, founded in 2015 by Aaron Andricci, and we have built and remodeled Denver-area homes for about 10 years. Ask for a clear contract.
A custom home is not a production house with a fixed floor plan. You are paying for a home designed around your lot and how you live, built to the codes and site conditions above. When you interview builders, confirm licensing and insurance, ask who pulls the permits, and ask how allowances and change orders are documented. Be cautious of anyone who cannot provide a street address, who presses you to sign immediately, or who asks for a large payment without a written agreement.
Aaron Andricci founded Hammer Hero LLC in 2015. We are licensed and insured. If you also need a kitchen, bathroom, or basement project in an existing home, those services are here:

What is included in a Hammer Hero custom home build?
A Hammer Hero custom build includes design coordination, permits, construction, and finishes, from site preparation and foundation through framing, systems, and interior finishes. We manage inspections and a final walkthrough. The $300 to $600 per-square-foot range does not include the land, utility tap or hookup fees, or landscaping. Your contract will spell out the full scope before you sign.
We will go through those included and excluded items with you in the estimate so the budget you approve matches the house you expect.
Neighborhoods we build in
Homes by Hammer Hero builds across Denver and the Front Range within about 50 miles. These neighborhood guides explain the lots, zoning, and permits in each area:
- Cherry Creek — Scarce single-family lots, scrape-and-rebuild, and two-story ADUs.
- Washington Park (Wash Park) — Rebuilds on full-size lots, pop-tops in Wash Park West, parkway setbacks.
- Highland and West Highland — Narrow lots, duplex zoning, the Potter Highlands overlay, alley ADUs.
- Bonnie Brae — Curving 1920s streets, E-SU-Dx zoning, larger ADUs on lots over 7,000 sq ft.
- Greenwood Village — Acre-scale lots, City of Greenwood Village permits, 2018 codes.
- Cherry Hills Village — Acre-scale lots, City of Cherry Hills Village permits, neighborhood input meeting, 2024 codes.
- Boulder — City of Boulder permits, 2024 energy code, floor-area limits, and city ADU rules.
Building somewhere else? Contact us and we will check your lot.
Start your Homes by Hammer Hero build
A custom home built around your life, your lot, and your budget starts with a conversation. Call Hammer Hero LLC at (720) 327-5898 or email hammerheropro@outlook.com to schedule a Homes by Hammer Hero consultation. You can also reach us at https://hammerheros.com/contact-us/.
Hammer Hero LLC
3230 W Mississippi Ave, Denver, CO 80219
(720) 327-5898
hammerheropro@outlook.com
Monday through Friday, 8:00 AM to 4:00 PM. Saturday and Sunday closed.
Last updated: November 18, 2026